PROJEKT KONTROLE ONEČIŠĆENJA U POLJOPRIVREDI
   
NOVOSTI
Završna ocjena projekta - postignuti svi operativni ciljevi
Završna ocjena projekta - postignuti svi operativni ciljevi
Nakon poslijednjeg anketiranja proizvođača i analize ostalih dostupnih podataka, izvršena ocjena indikatora uspješnosti projekta

U svrhu dovršetka ocjene projekta, u travnju 2012 provedeno je završno anketiranje proizvođača na cijelom teritoriju RH. Zajedno sa ostalim informacijama, odgovori ankete dali su uvid u stanje pojedinih indikatora za mjerenje uspješnosti. Navodimo ih u daljnjem tekstu:

• At least 40% of the farming population in the project areas adopting  preventive and remedial measures to reduce nutrient discharge.

Završni rezultat: 94%

• Increased national awareness of linkages between local actions and impact on water nutrient load.

Ciljani rezultat: 25%
Završni rezultat: 80%

• At least 10% reduction in discharge of nutrients into surface and groundwater in the three project regions.

Završni rezultat: 12%

• Percentage of livestock farms in three participating counties that have (some) animal waste storages

Ciljani rezultat: 30%
Završni rezultat: 88%

• Unified set of monitoring guidelines and standards for soil and water adopted and implemented

Implementirano

• Distribution of Code of Good Agricultural Practices

Implementirano

• Multi-annual applied research into economic crop fertilizer response successfully completed

Implementirano

• At least 200 ha of pilot GAP demonstration sites in each of the three counties

Implementirano 16% više - 232 ha po projektnoj županiji

• Percentage of cropped area in the project counties under relevant nutrient reduction measures

Ciljani rezultat: 30%
Završni rezultat:81%

• Percentage increase of rural population in project and non-project areas aware of and initiating / implementing actions related to nutrient reduction

Ciljani rezultat: 85%
Završni rezultat:100%

• Monitoring and Evaluation system established and operating, providing  guidance for improving project and Nitrates management

Implementirano

• Continued strong support for the Steering Committee

Implementirano

• Project audit

Implementirano

 

 